Drawing of Record Submitted |
02/09/2007..2/16/2007 |
Electronic Drawing |
02/09/2007..2/16/2007 |
Final Grading Report |
02/09/2007 |
Date Scheduled |
02/14/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
2/15/07 Corrections Required per Wayne McIntosh - Need to fix locate wire will not trace out of valve collars.
2/23/07 Approved per Wayne. M. Corrections have been made. |
Wastewater |
2/15/07 Corrections Required per Wayne McIntosh - Need to fix locate wire will not trace out of valve collars.
2/23/07 Approved per Wayne. M. Corrections have been made. |
Engineering |
02/22/2007 Approved per Carlos Robles
2/12/2008 Approved per Brandon Wright..1 yr warranty |
City Development Engineer |
02/14/2007 Corrections required Per Ken Bricker. Parking lot fence is being installed, building materials still on stie. Electronic Dwg of records- show storm drainiage on as-builts.
02/20/2007 Corrections required Per Ken Bricker.. Electronic Dwg of record still needs to show storm drain info. Security is still being installed, landscape incomplete.
2/27/07 Corrections required per Cathy H. Electronic drawing of record must show drainage. per Ken B. Parking lot asphalt is spauling, general clean up is needed, tools laying in parking lot, lumber laying in parking lot, dumpster sitting, outside of enclosure.
3/1/07 Approved per Cathy Hasfurther
2/4/08 - 1 year warranty - approved per Ken B. Check Landscape only. |
Landscaping |
02/14/2007 Approved per Ken Bricker
2/4/08 - 1 year warranty - approved per Ken B. Check Landscape only. |
| |
General Comments: |
|