[Foremaster Ridge Phase V]
Number: Grading-36815

Drawing of Record Submitted 03/08/2007..revised 4/11/07
Electronic Drawing 03/08/2007..revised 4/11/07
Final Grading Report 03/26/2007
Date Scheduled 03/28/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 4/6/07 Approved per Dennis Wright. 6/3/2008 Approved per Dennis Wight.. 1yr warranty
Water 03/28/2007 Approved per Zene (Irrigation) 03/28/2007 Corrections required per Wayne M... Meet with Tom and went over corrections that need to be made. 03/30/2007 Corrections per Wayne M.. Called Tom, job is not ready for reinspect. 04/12/2007 Approved per Wayne M.. Replace Fire Hyd that was to high all corrections have been made to pass Final. 6/13/08 - 1 year warranty - approved per Carson Tait. Wire Good.
Wastewater 03/28/2007 Approved per Zene (Irrigation) 03/28/2007 Corrections required per Wayne M... Meet with Tom and went over corrections that need to be made. 03/30/2007 Corrections per Wayne M.. Called Tom, job is not ready for reinspect. 04/12/2007 Approved per Wayne M.. Replace Fire Hyd that was to high all corrections have been made to pass Final. 6/13/08 - 1 year warranty - approved per Carson Tait. Wire Good.
Engineering 03/28/2007 Corrections required per Carlos Robles.. Fix aspahlt, replace handicap ramps,remove broken sidewalk 04/11/2007 Corrections required per Carlos Robles.. Not Ready 7/6/2007 Approved per Carlos R. 1/7/2008 Approved per Carlos Robles 1yr warranty
City Development Engineer 3/28/07 corrections required per Cathy H. Electronic dwg of record - move into state plane coordinate system (City Hen) and show rock wall locations on plan. per Ken B - spawling asphalt at 1750 E; East Ridge Dr; 330 S; East Ridge Drive. 4/13/07 Corrections required per Cathy H. Electronic DWG of record needs to be placed in the HCN coordinate system to be used in our GIS database. per Ken B - asphalt is spawling in places and potting has started. 04/12/2007 Corrections required per Ken Bricker.. Electronic Dwg of record needs to be placed in the HCN coorinate system to be used in out GIS database. Asphalt is spauling in places and potting has started. 7/6/07 Approved per Cathy H. 6/10/2008 Approved per Ken Bricker 1 yr warranty
Landscaping 3/28/07 Approved per Ken B. 6/10/2008 Approved per Ken Bricker 1 yr warranty
    