Joes' Rental(Millcreek Indrust) #12
Number: Grading-37025

Drawing of Record Submitted 7/9/2008
Electronic Drawing 7/9/2008.. revised. 3/11/2009
Final Grading Report 7/10/2008
Date Scheduled 7/14/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 7/22/2009 Approved per Dennis Wright
Water 7/15/2008 Corrections required per Darrin Judd.. Valve's on East Side of building need to be poured. Rod Capson says the City power dept will pave road then lift cans and pour collars. He needs to prove ths to be correct before Final can be signed. 3/16/2009 Corrections required per Carson Tait..Need arrows (for direction of flow) and line sizes cut into concrete valve box collars. Need access to the Fire riser. Need backflow test report on the Fire Riser assembly. Need to protect the fire hydrant with either bollards or concrete parking stop. Need to cut rebar out of the meter box where it limits access other meter nuts. 5/19/2009 Corrections required per Carson Tait.. Need back flow test report on the fire riser assembly. Need direction of flow and line size cut into the conrete valve collars 7/23/2009 Approved per Kevin Condie.. Rod said he will put in concrete bumper in front of hydrant on monday 7/27/09.
Wastewater 7/15/2008 Corrections required per Darrin Judd.. Valve's on East Side of building need to be poured. Rod Capson says the City power dept will pave road then lift cans and pour collars. He needs to prove ths to be correct before Final can be signed. 3/16/2009 Corrections required per Carson Tait..Need arrows (for direction of flow) and line sizes cut into concrete valve box collars. Need access to the Fire riser. Need backflow test report on the Fire Riser assembly. Need to protect the fire hydrant with either bollards or concrete parking stop. Need to cut rebar out of the meter box where it limits access other meter nuts. 5/19/2009 Corrections required per Carson Tait.. Need back flow test report on the fire riser assembly. Need direction of flow and line size cut into the conrete valve collars 7/23/2009 Approved per Kevin Condie.. Rod said he will put in concrete bumper in front of hydrant on monday 7/27/09.
Engineering 7/29/2009 Approved per Carlos Robles.. Note: Improvements must be completed.
City Development Engineer 7/15/08 corrections required per Cathy H . Electronic dwg of record needs to be placed in city HCN system. How is FH going to be accessed from drive area in back? May need to contact fire and water. per Ken B. Road/lane not paved, missing rip-rap at rear storm drain discharge. 3/5/2009 Corrections required per Cathy H..1. Electronic Dwg of Record needs to be placed in City HCN system. 2. Install catch basin at Lav point as shown on approved plans and 12" pipe connecting catch basins(see Attached). 3. Extend 12" pipe to South as shown approved plan (See Attached).4. Install 4" raised asphalt edge and pavement in rear of building to meet City parking requirements(City Code (10-19-8) 5. Concern with stability of Fire hydrant(contract water department) 3/12/09 corrections required per Cathy H. Electronic DWG of record missing some required improvements from site plan. per Ken B. No change on items 2-5 above. 5/22/09 corrections required per Cathy H. Electronic DWG of record needs to show what is installed per plan. Storm drain has been extended, but not shown correctly. Paper copy also needs to reflect correct improvements. Install catch basin as shown on approved plans with 12" diameter (see attached). Install 6" diameter pipe from pole to beyond 4" curb wall (see attached - on approved plans). Install 4" asphalt curb wall on South side and install pavement as per approved plans (see attached) - Also reference city code 10-19-8. Call with any questions. 7/22/09 corrections required per Cathy H. Electronic DWG of record needs to show what is installed per plan. Storm drain has been extended, but not shown correctly. Also needs to be placed in City HCN. Paper copy also needs to reflect correct improvements. Install catch basin as shown on approved plans with 12" diameter (see attached). Install 6" diameter pipe from pole to beyond 4" curb wall (see attached - on approved plans). Install 4" asphalt curb wall on South side and install pavement as per approved plans (see attached) - Also reference city code 10-19-8. Call with any questions.
Landscaping 7/15/08 corrections required per Cathy H . Electronic dwg of record needs to be placed in city HCN system. How is FH going to be accessed from drive area in back? May need to contact fire and water. per Ken B. Road/lane not paved, missing rip-rap at rear storm drain discharge. 7/22/09 approved per Cathy H.
    
General Comments: