Drawing of Record Submitted |
10/02/2006 |
Electronic Drawing |
10/02/2006 |
Final Grading Report |
10/02/2006 |
Date Scheduled |
10/11/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/11/06 Corrections required per Tim Dotson. Needs concrete around meter boxes with rebar. Concrete around hydrant phase 1 only.
10/20/2006 Approved per Tim Dotson
10/05/2007 Approved per Tim Dotson.. 1 year warranty |
Wastewater |
10/11/06 Corrections required per Tim Dotson. Needs concrete around meter boxes with rebar. Concrete around hydrant phase 1 only.
10/20/2006 Approved per Tim Dotson
10/05/2007 Approved per Tim Dotson.. 1 year warranty |
Engineering |
10/12/06 Corrections required per Brandon W. Handicap ramps, truncated domes. Clear streets, sidewalks for inspections. Clean DI boxes. Finish sidewalks.
11/03/2006 Corrections required per Brandon Wright.. NOT READY
11/06/2006 Corrections per Brandon W. Clean DI boxes..grout pipes in DI Boxes.
11/08/2006 Corrections required per Brandon W.. Grout storm drain on River Road in DI box
11/13/06 Approved per Brandon Wright.
2/11/2008 Approved per Carlos Robles.. 1yr warranty |
City Development Engineer |
10/12/06 Corrections required per Ken B. Building materials pilled on sidewalks. General clean up required. Streets are incomplete (construction phase). End of street markers are required. [per Cathy H . -- Electronic drawing of record - provide dimensions of sewer laterals from SMH to C.O. & TBC to C.O. Show all drainage as constructed.]
10/27/06 Corrections Required per Cathy H. Landscaping needs to be completed. Private development certificate improvement.
11/02/2006 Corections required erp Cathy H.. Landscaping needs to be completed.
11/03/2006 Approved per Cathy H.
10/09/2007 Corrections required per Ken Bricker.. 1 yr warranty.. River Road only.. ramp missing at sidewalks.
1/23/2008 Approved per Cathy H.. 1 yr warranty.. check River Road Only |
Landscaping |
10/12/06 Corrections required per Ken B - No landscaping present on this project.
10/27/06 Corrections Required per Cathy H. Landscaping needs to be completed. Private development certificate improvement.
11/03/2006 Corrections required per Cathy H.. Landscaping needs to be completed.
11/15/06 Corrections required per Cathy H. L/S needs to be completed.
11/21/2006 Corrections required per Ken B. Landscaping is incomplete.
11/29/06 Approved by Cathy H with condition that each building and clubhouse will need landscaping installed before CO is issued.
10/09/2007 Corrections required per Ken Bricker.. 1 yr warranty.. River Road only.. ramp missing at sidewalks.
1/23/2008 Approved per Cathy H.. 1 year Warranty.. Check River Road Only |
| |
General Comments: |
|