[Cottages @ Fossil Hills Phase 1]
Number: Grading-37035

Drawing of Record Submitted 10/02/2006
Electronic Drawing 10/02/2006
Final Grading Report 10/02/2006
Date Scheduled 10/11/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 10/11/06 Corrections required per Tim Dotson. Needs concrete around meter boxes with rebar. Concrete around hydrant phase 1 only. 10/20/2006 Approved per Tim Dotson 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Wastewater 10/11/06 Corrections required per Tim Dotson. Needs concrete around meter boxes with rebar. Concrete around hydrant phase 1 only. 10/20/2006 Approved per Tim Dotson 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Engineering 10/12/06 Corrections required per Brandon W. Handicap ramps, truncated domes. Clear streets, sidewalks for inspections. Clean DI boxes. Finish sidewalks. 11/03/2006 Corrections required per Brandon Wright.. NOT READY 11/06/2006 Corrections per Brandon W. Clean DI boxes..grout pipes in DI Boxes. 11/08/2006 Corrections required per Brandon W.. Grout storm drain on River Road in DI box 11/13/06 Approved per Brandon Wright. 2/11/2008 Approved per Carlos Robles.. 1yr warranty
City Development Engineer 10/12/06 Corrections required per Ken B. Building materials pilled on sidewalks. General clean up required. Streets are incomplete (construction phase). End of street markers are required. [per Cathy H . -- Electronic drawing of record - provide dimensions of sewer laterals from SMH to C.O. & TBC to C.O. Show all drainage as constructed.] 10/27/06 Corrections Required per Cathy H. Landscaping needs to be completed. Private development certificate improvement. 11/02/2006 Corections required erp Cathy H.. Landscaping needs to be completed. 11/03/2006 Approved per Cathy H. 10/09/2007 Corrections required per Ken Bricker.. 1 yr warranty.. River Road only.. ramp missing at sidewalks. 1/23/2008 Approved per Cathy H.. 1 yr warranty.. check River Road Only
Landscaping 10/12/06 Corrections required per Ken B - No landscaping present on this project. 10/27/06 Corrections Required per Cathy H. Landscaping needs to be completed. Private development certificate improvement. 11/03/2006 Corrections required per Cathy H.. Landscaping needs to be completed. 11/15/06 Corrections required per Cathy H. L/S needs to be completed. 11/21/2006 Corrections required per Ken B. Landscaping is incomplete. 11/29/06 Approved by Cathy H with condition that each building and clubhouse will need landscaping installed before CO is issued. 10/09/2007 Corrections required per Ken Bricker.. 1 yr warranty.. River Road only.. ramp missing at sidewalks. 1/23/2008 Approved per Cathy H.. 1 year Warranty.. Check River Road Only
    