Drawing of Record Submitted |
12/21/2006 |
Electronic Drawing |
12/21/2006 |
Final Grading Report |
12/21/2006 |
Date Scheduled |
12/27/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/29/06 Approved per Tim Dotsen
1/8/2008 Approved per Wayne M.. 1 yr warranty |
Wastewater |
12/29/06 Approved per Tim Dotsen
1/8/2008 Approved per Wayne M.. 1 yr warranty |
Engineering |
02/15/2007 Approved per Carlos Robles
2/11/208 Approved per Caros Robles.. 1yr warranty |
City Development Engineer |
12/27/2006 Corrections required per Ken Bricker.. Landscaping and sidewalks are missing.. Building Permits ok
02/01/2007 Corrections required per Ken Bricker.. Building materials still on site, extreior shell of building is in complete.
02/07/2007 Corrections required per Ken Bricker.. Landscaping incomplete on River Road
Bldg 20 Cannot obatain a CO until Landscaping along River Road is complete.
02/14/2007 Approved per Cathy H.. Note: Bldg 20 cannot obtain a CO until L/S along River Road is complete.
01/16/2007 Approved per Ken Bricker
1/3/08 - 1 year warranty - Approved per Cathy H. Private streets/drives. |
Landscaping |
12/27/2006 Corrections require dper Ken Bricker.. Landscaping and sidewalks are missing.. Building Permits OK JS.
02/01/2007 Corrections required per Ken Bricker.. Landscaping not in, building materials still on site,
02/07/2007 Corrections required per Ken Bricker.. Landscaping incomplete on River Road.Bldg 20 Cannot obatain a CO until Landscaping along River Road is complete.
02/14/2007 Approved per Cathy H. Note: Bldg 20 cannot obatin a Co until L/S along River Road is complete.
01/16/2007 Approved per Ken Bricker
1/3/08 - 1 year warranty - Approved per Cathy H. Private streets/drives. |
| |
General Comments: |
|