[Eastridge Phase VI]
Number: Grading-37069

Drawing of Record Submitted 11/02/2006
Electronic Drawing 11/02/2006..e-mail to lonnie
Final Grading Report 11/02/2006
Date Scheduled 11/06/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 11/6/06 Approved per Dennis Wright. 10/4/07 - 1 year warranty - approved per Dennis Wright.
Water 11/08/2006 Approved per Tim Dotson 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Wastewater 11/08/2006 Approved per Tim Dotson 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Engineering 11/8/06 Approved per Carlos R. 10/12/2007 Approved per Carlos Robles 1 yr waranty
City Development Engineer 11/9/06 Corrections required per Ken B/Cathy H. Remove tires in the street. General cleanup needed. Electronic dwg of record - sewer c.o. needs to be tied from TBC and property line and provide actual pad elevations (need shots on pad). 11/15/06 Approved per Cathy H. 10/09/2007 Approved per Ken B.. 1 year warranty
Landscaping 11/13/06 Approved per Ken B 10/9/2007 Approved per Ken B. 1 year warranty
    
General Comments: