| Drawing of Record Submitted | 03/09/2007 |
|---|---|
| Electronic Drawing | 03/09/2007 |
| Final Grading Report | 03/09/2007 |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 3/19/07 IRRIGATION - NA per Zene. 3/19/07 Corrections required per Wayne M - Gave project manager a punch list of corrections that need to be made on water system. 3/20/07 Approved per Wayne M. 7/2/2010 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 3/19/07 IRRIGATION - NA per Zene. 3/19/07 Corrections required per Wayne M - Gave project manager a punch list of corrections that need to be made on water system. 3/20/07 Approved per Wayne M. 7/2/2010 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 3/21/07 Approved per Carlos R. 2/6/2008 Approved per Carlos R 1 yr warranty |
| City Development Engineer | 3/14/07 Corrections required per Ken B. Still under construction. Dumpster on site, dirt berms present, construction materials still on site, port-a-pot on site, asphalt spawling and pitting, general cleanup needed. 3/19/07 Corrections required per Ken B. Asphalt needs R/R shell is incomplete, dirt and rock piles still on site. 3/21/07 Approved per Cathy H. Trash enclosure is not built to plans. Requires CMU & solid metal gates. Have 1 week to complete. 04/02/2007 Corrections required per Ke Bricker ..Trash enclosure is not built.. parking lot asphlat needs replaced or repaired 5/3/07 Approved per Carlos R for Jay S. 2/4/08 - 1 year warranty - approved per Ken B. Only look @ public streets along frontage of lot 1. |
| Landscaping | 3/14/07 Corrections required per Ken B. Landscaping incocmplete. 3/19/07 Corrections required per Ken B. Landscape still being installed. 3/21/07 Approved per Ken B. 2/4/08 - 1 year warranty - approved per Ken B. Only look @ public streets along frontage of lot 1. |
| General Comments: | |