Drawing of Record Submitted |
10/23/2006 |
Electronic Drawing |
10/23/2006 |
Final Grading Report |
10/23/2006 |
Date Scheduled |
10/24/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/24/2006 Corrections required per Wayne M. Gave the contractor a punch list.. Need backflow cert and paint Hydrant cut arrow and pipe size in cement.
11/2/06 - Approved per Tim Dotson
10/05/2007 Approived per Tim Dotson.. 1 year warranty |
Wastewater |
10/24/2006 Corrections required per Wayne M. Gave the contractor a punch list.. Need backflow cert and paint Hydrant cut arrow and pipe size in cement.
11/2/06 - Approved per Tim Dotson
10/05/2007 Approived per Tim Dotson.. 1 year warranty |
Engineering |
11/13/06 Approved per Carlos R. |
City Development Engineer |
10/31/2006 Approved per Ken Bricker
10/9/07 - 1 year warranty - NA private parking lot per Cathy H. |
Landscaping |
10/31/2006 Corrections required per Ken Bricker..Landscaping incomplete..general cleanup
11/16/06 Approved per Ken B
10/9/07 - 1 year warranty - NA private parking lot per Cathy H. |
| |
General Comments: |
|