| Drawing of Record Submitted | 10/23/2006 |
|---|---|
| Electronic Drawing | 10/23/2006 |
| Final Grading Report | 10/23/2006 |
| Date Scheduled | 10/24/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/24/2006 Corrections required per Wayne M. Gave the contractor a punch list.. Need backflow cert and paint Hydrant cut arrow and pipe size in cement. 11/2/06 - Approved per Tim Dotson 10/05/2007 Approived per Tim Dotson.. 1 year warranty |
| Wastewater | 10/24/2006 Corrections required per Wayne M. Gave the contractor a punch list.. Need backflow cert and paint Hydrant cut arrow and pipe size in cement. 11/2/06 - Approved per Tim Dotson 10/05/2007 Approived per Tim Dotson.. 1 year warranty |
| Engineering | 11/13/06 Approved per Carlos R. |
| City Development Engineer | 10/31/2006 Approved per Ken Bricker 10/9/07 - 1 year warranty - NA private parking lot per Cathy H. |
| Landscaping | 10/31/2006 Corrections required per Ken Bricker..Landscaping incomplete..general cleanup 11/16/06 Approved per Ken B 10/9/07 - 1 year warranty - NA private parking lot per Cathy H. |
| General Comments: | |