Drawing of Record Submitted |
12/13/2007 |
Electronic Drawing |
12/13/2007 |
Final Grading Report |
12/11/2007 |
Date Scheduled |
12/18/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
12/18/2007 Approved per Dennis Wright |
Water |
12/20/2007 Corrections required per Wayne M.. Meet contractors on job and gave him a list of corrections.
3/21/08 approved per Kevin Condie |
Wastewater |
12/20/2007 Corrections required per Wayne M.. Meet contractors on job and gave him a list of corrections.
3/21/08 approved per Kevin Condie |
Engineering |
12/19/2007 Approved per Brandon Wright |
City Development Engineer |
12/20/07 corrections required per Cathy H. Electronic DWG of record needs to be put into the city HCN system. Per Ken B. - access is blocked due to incomplete construction, holes in asphalt, ADA striping missing, concrete work is incomplete (forms still in place).
3/20/08 corrections required per Ken B. Large holes in back parking lot area, need to fill and pave surface.
3/28/2008 Corrections required per Ken Bricker.. Covered parking stalls are still under construction |
Landscaping |
12/20/07 corrections required per Cathy H. Electronic DWG of record needs to be put into the city HCN system. Per Ken B. - access is blocked due to incomplete construction, holes in asphalt, ADA striping missing, concrete work is incomplete (forms still in place).
3/20/08 corrections required per Ken B. Large holes in back parking lot area, need to fill and pave surface.
3/28/2008 Corrections required per Ken Bricker.. Covered parking still under construction |
| |
General Comments: |
|