[Dixie High Seminary]
Number: Grading-37171

Drawing of Record Submitted 03/16/2007
Electronic Drawing 03/16/2007
Final Grading Report 03/21/2007
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 3/30/07 Approved per Dennis Wright.
Water 3/28/07 Corrections required per Wayne M - Need to re-pour valve collar in Dixie High parking lot, and cut arrows with pipe size in all concrete collars. Paint fire hydrant. Get cert on fire riser and for landscaping backflow. Locate wire on 8" main has 2 bad spots. 3/28/07 Approved per Wayne M. 3/10/2008 Approved per Darrin Judd.. 1 yr warranty.. wire ok, meter box ok
Wastewater 3/28/07 Corrections required per Wayne M - Need to re-pour valve collar in Dixie High parking lot, and cut arrows with pipe size in all concrete collars. Paint fire hydrant. Get cert on fire riser and for landscaping backflow. Locate wire on 8" main has 2 bad spots. 3/28/07 Approved per Wayne M. 3/10/2008 Approved per Darrin Judd.. 1 yr warranty.. wire ok, meter box ok
Engineering 3/28/07 Approved per Brandon Wright. 3/20/2208 Approved per Brandon Wright.. 1 yr warranty
City Development Engineer 3/22/07 Corrections required per Ken B. End of road markers are required. Storm drain grates being cleaned out. Fire hydrant pad missing. 3/28/07 Approved per Ken Bricker 3/6/08 - 1 year warranty - approved per Ken B.
Landscaping 3/22/07 Approved per Ken B. 3/6/08 - 1 year warranty - approved per Ken B.
    
General Comments: