[Fort Pierce-Innomark #63]
Number: Grading-37228

Drawing of Record Submitted 11/08/2007
Electronic Drawing 11/08/2007
Final Grading Report 11/21/2007
Date Scheduled 11/28/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/03/2007 Approved per Tim Dotson 11/13/2008 Approved per Carson Tait..1 year warranty.. wire good
Wastewater 12/03/2007 Approved per Tim Dotson 11/13/2008 Approved per Carson Tait..1 year warranty.. wire good
Engineering 12/14/2007 Approved Per Brandon Wright 11/05/2008 Corrections required per Brandon Wright.. 1 yr warranty.. Truck are using west side of prop driveway no approved Drive way there
City Development Engineer 11/29/07 corrections required per Ken B. Chain link fence is not allowed at frontage next to detention area. West half of lot #63 is still under construction with heavy equipment present. 12/14/07 approved per Cathy H. 11/4/08 - 1 year warranty - approved per Cathy H- No public improvements.
Landscaping 11/29/07 corrections required per Ken B. Chain link fence is not allowed at frontage next to detention area. West half of lot #63 is still under construction with heavy equipment present. 12/14/07 approved per Cathy H. 11/20/2008 Approved per Larry Shane.. 1 year warranty
    
General Comments: