Drawing of Record Submitted |
7/20/2007 |
Electronic Drawing |
7/20/2007 |
Final Grading Report |
7/20/2007 |
Date Scheduled |
7/25/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
8/2/2007 Approved per Kevin Condie
8/28/2008 Approved per Kevin Conde.. 1 yr warranty |
Wastewater |
8/2/2007 Approved per Kevin Condie
8/28/2008 Approved per Kevin Conde.. 1 yr warranty |
Engineering |
7/27/2007 Approved per Carlos R.
9/17/2008 Approved per Carlos Robles.. 1 yr warranty |
City Development Engineer |
7/25/2007 Corrections required per Ken Bricker.. Electronic Dwg of record needs to show SD pipe size, type, and lengths
7/26/07 approved per Ken B.
8/7/08 - 1 year warranty - Check public streets - English Ivy - Approved per Ken B. |
Landscaping |
7/25/2007 Corrections required per Ken Bricker.. Phase 28 map was provide (Not sure which phase is correct)
7/26/07 approved per Ken B.
8/7/08 - 1 year warranty - Check public streets - English Ivy - Approved per Ken B. |
| |
General Comments: |
|