Drawing of Record Submitted |
04/27/2007 |
Electronic Drawing |
04/27/2007 |
Final Grading Report |
04/27/2007 |
Date Scheduled |
05/01/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie.
05/14/2007 Approved per Kevin Condie
5/2/2008 Approved per Kevin Condie.. 1 yr warranty |
Wastewater |
05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie.
05/14/2007 Approved per Kevin Condie
5/2/2008 Approved per Kevin Condie.. 1 yr warranty |
Engineering |
5/8/07 approved per Carlos R.
4/10/2008 Approved per Carlos Robles 1yr warranty |
City Development Engineer |
5/4/07 approved per Cathy H. Electronic dwg of record needs to shift to match HCN system. Sewer laterals need to be tied to nearest SMH & TBC. As built pts need to be in the DWG file.
4/3/08 - 1 year warranty - approved per Ken B... public streets only |
Landscaping |
5/4/07 approved per Ken B.
4/3/08 - 1 year warranty - approved per Ken B.. public streest only |
| |
General Comments: |
|