| Drawing of Record Submitted | 04/27/2007 |
|---|---|
| Electronic Drawing | 04/27/2007 |
| Final Grading Report | 04/27/2007 |
| Date Scheduled | 05/01/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie. 05/14/2007 Approved per Kevin Condie 5/2/2008 Approved per Kevin Condie.. 1 yr warranty |
| Wastewater | 05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie. 05/14/2007 Approved per Kevin Condie 5/2/2008 Approved per Kevin Condie.. 1 yr warranty |
| Engineering | 5/8/07 approved per Carlos R. 4/10/2008 Approved per Carlos Robles 1yr warranty |
| City Development Engineer | 5/4/07 approved per Cathy H. Electronic dwg of record needs to shift to match HCN system. Sewer laterals need to be tied to nearest SMH & TBC. As built pts need to be in the DWG file. 4/3/08 - 1 year warranty - approved per Ken B... public streets only |
| Landscaping | 5/4/07 approved per Ken B. 4/3/08 - 1 year warranty - approved per Ken B.. public streest only |
| General Comments: | |