Sun River Phase 20
Number: Grading-37333

Drawing of Record Submitted 04/27/2007
Electronic Drawing 04/27/2007
Final Grading Report 04/27/2007
Date Scheduled 05/01/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie. 05/14/2007 Approved per Kevin Condie 5/2/2008 Approved per Kevin Condie.. 1 yr warranty
Wastewater 05/05/2007 Corrections required Make sure all Fire Hydrants are plumb. Clean and paint hydrants.5/11/07 approved per Kevin Condie. 05/14/2007 Approved per Kevin Condie 5/2/2008 Approved per Kevin Condie.. 1 yr warranty
Engineering 5/8/07 approved per Carlos R. 4/10/2008 Approved per Carlos Robles 1yr warranty
City Development Engineer 5/4/07 approved per Cathy H. Electronic dwg of record needs to shift to match HCN system. Sewer laterals need to be tied to nearest SMH & TBC. As built pts need to be in the DWG file. 4/3/08 - 1 year warranty - approved per Ken B... public streets only
Landscaping 5/4/07 approved per Ken B. 4/3/08 - 1 year warranty - approved per Ken B.. public streest only
    
General Comments: