| Drawing of Record Submitted | 05/08/2007 |
|---|---|
| Electronic Drawing | 05/08/2007 |
| Final Grading Report | 05/08/2007 |
| Date Scheduled | 05/09/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 5/9/07 Approved per Dennis Wright. |
| Water | 05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes. 5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes. |
| Wastewater | 05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes. 5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes. |
| Engineering | |
| City Development Engineer | 5/10/07 Corrections required per Cathy H. Electronic dwg of record - cannot open dwg. Also, needs to be in the city HCN coordinate system. |
| Landscaping | 5/9/07 Approved per Ken B. |
| General Comments: | |