Sunrise Ridge Phase 4
Number: Grading-37338

Drawing of Record Submitted 05/08/2007
Electronic Drawing 05/08/2007
Final Grading Report 05/08/2007
Date Scheduled 05/09/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 5/9/07 Approved per Dennis Wright.
Water 05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes. 5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes.
Wastewater 05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes. 5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes.
Engineering
City Development Engineer 5/10/07 Corrections required per Cathy H. Electronic dwg of record - cannot open dwg. Also, needs to be in the city HCN coordinate system.
Landscaping 5/9/07 Approved per Ken B.
    
General Comments: