Drawing of Record Submitted |
05/08/2007 |
Electronic Drawing |
05/08/2007 |
Final Grading Report |
05/08/2007 |
Date Scheduled |
05/09/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/9/07 Approved per Dennis Wright. |
Water |
05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes.
5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes. |
Wastewater |
05/15/2007 Corrections required per Kevin Condie.. Meter boxes are pushed in,need to relieve pressure on sides or redo boxes.
5/24/07 corrections required per Daren Judd - Meter boxes are still pushed in. Need to releave pressure on sides or redo boxes. |
Engineering |
|
City Development Engineer |
5/10/07 Corrections required per Cathy H. Electronic dwg of record - cannot open dwg. Also, needs to be in the city HCN coordinate system. |
Landscaping |
5/9/07 Approved per Ken B. |
| |
General Comments: |
|