| Drawing of Record Submitted | 9/18/2007 |
|---|---|
| Electronic Drawing | 9/18/2007 |
| Final Grading Report | 9/18/2007 |
| Date Scheduled | 9/19/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9/21/2007 Approved per Dennis Wright 1/2/2009 Approved per Dennis Wright..1 year warranty |
| Water | 9/20/2007 Corrections required per Kevin Condie..Replace box on #lot711,fix box on lot #727, clean boxes, check wire, turn hydrant in cul-du- sac 10/09/2007 Approved per Kevin Condie 1/9/09 - 1 year warranty - approved per Kevin C. |
| Wastewater | 9/20/2007 Corrections required per Kevin Condie..Replace box on #lot711,fix box on lot #727, clean boxes, check wire, turn hydrant in cul-du- sac 10/09/2007 Approved per Kevin Condie 1/9/09 - 1 year warranty - approved per Kevin C. |
| Engineering | 9/19/2007 Corrections required per Brandon Wright.. Monuments not stamped,shoulder side walks 9/28/2007 Approved Per Brandon Wright 1/8/09 - 1 year warranty - Corrections required per Brandon W. Asphalt opening up around sewer collar in front of #715. Broken walk in fron tof #727. Settling sewer #706. Settling in fron tof $741 & #701. |
| City Development Engineer | 9/20/07 corrections required per Cathy H. 10% warranty Bond. 120% improvement guarantee bond for Ledges Parkway (East of 2nd access) and Landscaping. Electronic DWG of record needs to fit city HCN system. per Ken B - No landscaping present. 9/28/07 corrections required per Cathy H. 10% warranty bond. 120% improvement guarantee for Ledges Pkwy & Landscaping. 2/5/08 approved per Cathy H. 1/7/09 - 1 year warranty - approved per Ken B. |
| Landscaping | 9/20/07 corrections required per Cathy H. 10% warranty Bond. 120% improvement guarantee bond for Ledges Parkway (East of 2nd access) and Landscaping. Electronic DWG of record needs to fit city HCN system. per Ken B - No landscaping present. 9/28/07 corrections required per Cathy H. 10% warranty bond. 120% improvement guarantee for Ledges Pkwy & Landscaping. 2/5/08 approved per Cathy H. 1/15/2009 Corrections required per Doug W.. 1 year warranty.. no landscaping is installed in phase 7?here is one spec home or modu home that is landscape |
| General Comments: | |