Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
02/20/2007 |
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
4/6/07 Approved per Dennis Wright.
3/8/08 1 year warranty approved per Dennis Wright. |
Water |
3/12/07 - IRRIGATION - N/A per Zene M.
3/13/07 Approved per Kevin C.
3/19/08 - 1 year warranty - approved per Kevin Condie. Problem with wire going from phase 5 to 6. We can mark wire. |
Wastewater |
3/12/07 - IRRIGATION - N/A per Zene M.
3/13/07 Approved per Kevin C.
3/19/08 - 1 year warranty - approved per Kevin Condie. Problem with wire going from phase 5 to 6. We can mark wire. |
Engineering |
3/15/07 Approved per Brandon Wright - Final grading report not in spec. |
City Development Engineer |
3/13/07 Corrections required per Cathy H. Electronic dwg of record needs to include the point file for as built shots and needs to be placed on the Utah State Plan Coordinate System (NAD 83) for GIS use. per Ken B - concrete collars are being installed.
04/06/2007 Approved per Ken Bricker
3/6/08 - 1 year warranty - NA/Approve - Private Streets per Cathy H. |
Landscaping |
3/13/07 Approved per Ken B.
4/6/07 Approved per Ken B.
3/6/08 - 1 year warranty - NA/Approve - Private Streets per Cathy H. |
| |
General Comments: |
|