Drawing of Record Submitted |
09/25/2006 |
Electronic Drawing |
09/25/2006 |
Final Grading Report |
09/13/2006 |
Date Scheduled |
09/26/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
09/28/2006 Approved per Tim Dotson |
Wastewater |
09/28/2006 Approved per Tim Dotson |
Engineering |
11/03/2006 Approved per Carlos R. |
City Development Engineer |
10/04/2006 Corrections required per Ken Bricker.. Driveway doesn't align with cross drive.Piles of rocks and building materials in gutter and up next to building.
11/08/2006 Corrections required per Ken Bricker.. Building materials in detention area sight corridor is blocked by landscaping at the access/exit
12/05/2006 Corrections required per Ken Brikcer.. Need traffic approval of off site driveway or Moved
7/12/07 corrections required per Jay Sandberg. Driveway improvements not complete. |
Landscaping |
10/04/2006 Corrections required per Ken Bricker.. Rocks are not completed out behind Fire hydrant. Trash in detention area.
11/08/2006 Per Ken Bricker.. Building materials in detention area sight corridor is blocked by landscaping at the access/exit.
12/05/2006 Corrections required per Ken Brikcer.. Landscaping is incomplete at frontage of RIver Road, Building matl. Laying id detention area rip-file in parking lot.
7/12/07 corrections required per Jay Sandberg. Driveway improvements not complete. |
| |
General Comments: |
|