| Drawing of Record Submitted | 09/25/2006 |
|---|---|
| Electronic Drawing | 09/25/2006 |
| Final Grading Report | 09/13/2006 |
| Date Scheduled | 09/26/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 09/28/2006 Approved per Tim Dotson |
| Wastewater | 09/28/2006 Approved per Tim Dotson |
| Engineering | 11/03/2006 Approved per Carlos R. |
| City Development Engineer | 10/04/2006 Corrections required per Ken Bricker.. Driveway doesn't align with cross drive.Piles of rocks and building materials in gutter and up next to building. 11/08/2006 Corrections required per Ken Bricker.. Building materials in detention area sight corridor is blocked by landscaping at the access/exit 12/05/2006 Corrections required per Ken Brikcer.. Need traffic approval of off site driveway or Moved 7/12/07 corrections required per Jay Sandberg. Driveway improvements not complete. |
| Landscaping | 10/04/2006 Corrections required per Ken Bricker.. Rocks are not completed out behind Fire hydrant. Trash in detention area. 11/08/2006 Per Ken Bricker.. Building materials in detention area sight corridor is blocked by landscaping at the access/exit. 12/05/2006 Corrections required per Ken Brikcer.. Landscaping is incomplete at frontage of RIver Road, Building matl. Laying id detention area rip-file in parking lot. 7/12/07 corrections required per Jay Sandberg. Driveway improvements not complete. |
| General Comments: | |