[Ferris & Utley]
Number: Grading-37473

Drawing of Record Submitted 6/20/2007
Electronic Drawing 6/20/2007
Final Grading Report 6/20/2007
Date Scheduled 6/21/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 6/21/2007 Approved per Dennis Wright 6/3/2008 Approved per Dennis Wright.. 1 yr warranty
Water 6/27/2007 Approved per Dustin B. 7/14/200/.. 1yr warranty..Wire good-TD
Wastewater 6/27/2007 Approved per Dustin B. 7/14/200/.. 1yr warranty..Wire good-TD
Engineering 6/25/07 corrections required per Brandon Wright. 7/5/2007 Corrections required per Bradon W.. Hold per Cathy H. 7/12/07 approved per Brandon W. 6/3/2008 Corrections required per Brandon Wirght..1yr warranty.. Broken curb & walk at entrance along Sunset Dr entrance look like it has settled both in and out
City Development Engineer 6/21/07 corrections required per Ken B. Per Ken B - Right turn in access is sunken and asphalt is spauling and potting. Broken shoulder at curb. Trash enclosure not completed. Saw cuts in asphalt with 2'x2' areas removed along rear wall. Asphalt spauling in several locations throughout parking area. No stop sign at right out exit. per Cathy H. General site cleanup needed, privacy wall to be built (not complete). 7/5/07 corrections required per Cathy H. Pipe draining hillside behind trash enclosure needs to be punched through wall of enclosure near base (not draped over wall). Pad in front of trash enclosure broken. Repair concrete. Trim expansion joints at 5 & 7 stall on curb. Clean up asphalt and conc. pours on East side of property. Backfill concrete and asphalt along East edge of asphalt. Install a "DO NOT ENTER" sign in island at right out only. 7/12/07 approved per Cathy H. 6/10/08 - 1 year warranty - corrections required per Ken B. Damaged curb needs R&R at decel lane island.
Landscaping 6/21/07 corrections required per Ken B. Landscape is incomplete at back of building next to AC compressors. 6/29/07 corrections required per Cathy H. Need geotech letter on rock face. Per Ken B. Retaining wall should extend the distance of the face. 7/5/07 corrections required per Cathy H. Pipe draining hillside behind trash enclosure needs to be punched through wall of enclosure near base (not draped over wall). Pad in front of trash enclosure broken. Repair concrete. Trim expansion joints at 5 & 7 stall on curb. Clean up asphalt and conc. pours on East side of property. Backfill concrete and asphalt along East edge of asphalt. Install a "DO NOT ENTER" sign in island at right out only. 7/12/07 approved per Cathy H. 6/10/08 - 1 year warranty - corrections required per Ken B. Damaged curb needs R&R at decel lane island.
    
General Comments: