| Drawing of Record Submitted | 2/1/2008 |
|---|---|
| Electronic Drawing | 2/1/2008 |
| Final Grading Report | 2/8/2008 |
| Date Scheduled | 2/12/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 7/7/2008 Approved per Carson Tait 6/18/2009 Approved per Wayne M. 1 year warranty.. checked locate wire works good |
| Wastewater | 7/7/2008 Approved per Carson Tait 6/18/2009 Approved per Wayne M. 1 year warranty.. checked locate wire works good |
| Engineering | 2/11/2008 Approved per Caarlos Robles 6/15/2009 Approved per Carlos Robles..1 year warranty |
| City Development Engineer | 2/19/2008 Approved per Carlos Robles 6/22/09 - 1 year warranty - approved with conditions per Cathy H. Remove rusty iron wheel/spindle assembly from parking lot. Sidewalk and landscaping will be reviewed and approved at time of building. |
| Landscaping | 2/19/2008 Approved per Carlos Robles 6/22/09 - 1 year warranty - approved with conditions per Cathy H. Remove rusty iron wheel/spindle assembly from parking lot. Sidewalk and landscaping will be reviewed and approved at time of building. |
| General Comments: | |