[Cottages @ Fossil Hills Phase IV]
Number: Grading-37595

Drawing of Record Submitted 2/4/2008
Electronic Drawing 2/4/2008
Final Grading Report 2/4/2008
Date Scheduled 2/12/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 7/7/2008 Approved per Carson Tait 6/18/2009 Approved per Wayne M.. 1 year warranty.. Checked locate wire it worked good
Wastewater 7/7/2008 Approved per Carson Tait 6/18/2009 Approved per Wayne M.. 1 year warranty.. Checked locate wire it worked good
Engineering 2/19/2008 Approved per Carlos Robles 6/15/2009 Approved per Carlos Robles.. 1 year warranty
City Development Engineer 2/19/2008 Approved per Carlos Robles 6/22/09 - 1 year warranty - approved with conditions per Cathy H. Remove rusty iron wheel/spindle assembly from parking lot. Sidewalk and landscaping will be reviewed and approved at time of building.
Landscaping 2/19/2008 Approved per Carlos Robles 6/22/09 - 1 year warranty - approved with conditions per Cathy H. Remove rusty iron wheel/spindle assembly from parking lot. Sidewalk and landscaping will be reviewed and approved at time of building.
    
General Comments: