[Escalera Estates Phase 1-2-3]
Number: Grading-37604

Drawing of Record Submitted 6/13/2007
Electronic Drawing 6/13/2007
Final Grading Report 7/02/2007
Date Scheduled 7/05/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 7/9/2007 Approved per Dennis Wright 11/26/2007 Approved per Dennis Wright.. 1 year warranty
Water 7/10/2007 Corrections required per Dustin B..Entrance at water tank needs to cleaned out and dig against fence needs to be cleared away. fence to be stood back up or replaced. (middleton tank) 12/04/2007 Corrections required per Tim Dotson.. 1 yr warranty..Gates to tank need to be installed back to before construction
Wastewater 7/10/2007 Corrections required per Dustin B..Entrance at water tank needs to cleaned out and dig against fence needs to be cleared away. fence to be stood back up or replaced. (middleton tank) 12/04/2007 Corrections required per Tim Dotson.. 1 yr warranty..Gates to tank need to be installed back to before construction
Engineering 7/6/2007 Approved per Carlos Robles 11/27/2007 Approved per Carlos Robles.. 1 year warranty
City Development Engineer 7/6/07 approved per Cathy H. 10/31/2007 Approved per Ken Bricker.. 1 year warranty.. No corrections found
Landscaping 7/6/07 approved per Cathy H. 10/31/2007 Apporved per Ken Bricker.. 1 year warranty..No corrections found
    
General Comments: