| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 04/06/2007 Corrections required per Wayne M. Gave contractor punch list. 04/12/2007 Approved per Wayne M.. Corrections have been made to meet City Spec. |
| Wastewater | 04/06/2007 Corrections required per Wayne M. Gave contractor punch list. 04/12/2007 Approved per Wayne M.. Corrections have been made to meet City Spec. |
| Engineering | 04/04/2007 Corrections required per Mike Smith..1. Provide storm water barriers detail H-C10 to drop inlets sta 5+50 and 10+50 South side,sta 8+00 North side. 2.Clean top of curb,backfill void areas behind C 7Gr. 3. Clean up trash debris, concrete and asphalt, and plywood from MH's. 4. Have Western Rock fix void areas in the asphalt near sta 10+100 East bound lane. |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |