[Fort Pierce Industrial Phase V]
Number: Grading-33568

Drawing of Record Submitted 10/18/2006
Electronic Drawing 10/18/2006
Final Grading Report 10/18/2006
Date Scheduled 10/23/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 11/23/06 Corrections Required per Wayne M. Gave Quality X a punch list. 10/26/2006 Approved pe Tim Dotson 10/17/2007 Corrections required per Tim Dotson.. 1 year warranty.. Hydrant pad needs to be repalced on Venture Dr and Beehive Dr Going West up Venture from Beehive on North Side
Wastewater 11/23/06 Corrections Required per Wayne M. Gave Quality X a punch list. 10/26/2006 Approved pe Tim Dotson 10/17/2007 Corrections required per Tim Dotson.. 1 year warranty.. Hydrant pad needs to be repalced on Venture Dr and Beehive Dr Going West up Venture from Beehive on North Side
Engineering 10/27/2006 Approved Carlos R 10/11/2007 Corrections requiredp er Brandon Wright.. 1 yr warranty.. Roads failing in phase 5 need to be fixed
City Development Engineer 11/6/06 Approved per Jay Sandberg. Drawing of record okay. Plat recorded okay. 12/27/2006 Corrections required per Ken Bricker.. End of Road markers have been removed to extend construction.. Need advance warnign sign "pavement Ends" if end of road markers have been removed. Commerce Dr and Factory Dr. Drainage berm between lots 55, 56 and 54 not complete. Show on Drawing of Record. 10/09/2007 Approved per Ken Bricker.. 1 year warranty
Landscaping 11/6/06 Approved per Jay Sandberg. 12/27/2006 Approved per Ken Bricker 10/09/2007 Approved per Ken Bricker.. 1 yr warranty
    
General Comments: