[Festival Plaza]
Number: Grading-37732

Drawing of Record Submitted 7/16/2007
Electronic Drawing 6/28/2007..revised 8/17/2007
Final Grading Report 6/28/2007
Date Scheduled 7/17/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 7/17/07 approved per Dennis Wright. 7/2/08 - 1 year warranty - approved per Dennis Wright.
Water 7/19/2007 Corrections required per Tim Dotson..needs collar around valve in 3050 East tie in.. wire ok, needs rebar in meter boxes per specs.Pads 1 & 2 do not have meter sets. backflow tags. 8/23/2007 Corrections required per Carson Tait..As-built needs to show water services to pads 1 & 2, Need to complete the water service to pad #1. Backfill around the box add rebar and pour a concrete pad. need to do the same for pad #2. The water service must come off ofthe hydrant where the checker aurto service is located. The meterbox rebar is either missing or too much.please obtain and read a spec book detail. the rp is installed incorrectly. It must have a minimum of 12" clearence below the drain valve. The concrete finish on the valves north of bldg A is not acceptable. Do Over. 8/30/2007 Approved per Carson Tait 7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good
Wastewater 7/19/2007 Corrections required per Tim Dotson..needs collar around valve in 3050 East tie in.. wire ok, needs rebar in meter boxes per specs.Pads 1 & 2 do not have meter sets. backflow tags. 8/23/2007 Corrections required per Carson Tait..As-built needs to show water services to pads 1 & 2, Need to complete the water service to pad #1. Backfill around the box add rebar and pour a concrete pad. need to do the same for pad #2. The water service must come off ofthe hydrant where the checker aurto service is located. The meterbox rebar is either missing or too much.please obtain and read a spec book detail. the rp is installed incorrectly. It must have a minimum of 12" clearence below the drain valve. The concrete finish on the valves north of bldg A is not acceptable. Do Over. 8/30/2007 Approved per Carson Tait 7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good
Engineering 6/14/07 CHECKER AUTO - approved per Carlos R. 7/17/2007 Approved per Carlos R 7/11/2008 Approved per Carlos R 1 yr warranty
City Development Engineer 7/17/07 corrections required per Cathrine Hasfurther. Electronic dwg of record needs to be placed in the city HCN system. per Ken B - fire hydrant at rear still has forms at pad. General clean up is needed. 8/22/07 approved per Cathy H. 7/8/08 - 1 year warranty - Look @ improvements along 3050 E (2 Right turn lanes) - approved per Ken B.
Landscaping 7/17/07 corrections required per Cathrine Hasfurther. Electronic dwg of record needs to be placed in the city HCN system. per Ken B - fire hydrant at rear still has forms at pad. General clean up is needed. 8/22/2007 Approved Cathy H7/8/08 - 1 year warranty - Look @ improvements along 3050 E (2 Right turn lanes) - approved per Ken B.
    
General Comments: