| Drawing of Record Submitted | 5/12/2014 |
|---|---|
| Electronic Drawing | 5/12/2014 |
| Final Grading Report | 5/13/2014 e-mailed |
| Date Scheduled | 5/14/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 5/14/2014 Approved per Dennis Wright 3/24/2015 Approved per Bryce Mitchell 1 year warranty |
| Water | 5/29/2014 Approved Carson Wait 3/23/2015 Approved per Carson Tait.. 1 year warranty |
| Wastewater | 5/29/2014 Approved Carson Wait 3/23/2015 Approved per Carson Tait.. 1 year warranty |
| Engineering | 5/15/2014 Approved per Brandon Wright 3/25/2015 Corrections required per Brandon Wright.. 1 yr warranty.. Settle spot at water valve in culdesac 11/24/2015 Corrections required: No change in the last inspection |
| City Development Engineer | 5/08/2014 Corrrections required per John Graves.. STREETS DEPT Only per John Graves All signs need manufacture sticker on back..2. R1-1 Stop Sign @ Covington Dr and Chalor Circle Should be located per City drawing on NW corner of intersection Lot #75. 3. Street coords need to be on correct intersection Chalon Cir Chalon Dri 4. Need additional street coord Chalon Dri installed per City drawing on SW corner of Covington Dr & Chalon Dr Intersection. 5/20/2014 Approved Street Dept Only.. John Graves 6/02/2014 Approved per Wes Jenkins |
| Landscaping | 6/02/2014 Approved per Wes Jenkins |
| General Comments: | |