Drawing of Record Submitted |
7/25/2007 |
Electronic Drawing |
7/25/2007..revised 8/1/2007 |
Final Grading Report |
7/25/2007 |
Date Scheduled |
7/30/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
7/30/07 approved per Dennis Wright.7/2/08 - 1 year warranty - approved per Dennis Wright. |
Water |
7/30/2007 Approved per Tim Dotson
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Wastewater |
7/30/2007 Approved per Tim Dotson
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Engineering |
7/30/2007 Corrections required per Carlos. Back retaining wall needs to be completed as per zoning ordinance
8/8/2007 Approved per Carlos R
|
City Development Engineer |
7/30/07 corrections required per Cathy H. Electronic dwg of record needs to be on city HCN system and show all drainage improvements. per Ken B. General clean up is needed. Fire hydrant missing concrete pad. Curb shoulders R/R. Rear privacy wall incomplete.
8/2/07 corrections required per Cathy H. Electronic dwg of record is not showing detention facility location and capacity and drainage improvements are not labeled.
8/8/07 approved per Cathy H.
7/8/08 - 1 year warranty - Look @ right turn lane only on Red Hills Parkway - approved per Ken B. |
Landscaping |
7/30/07 corrections required per Ken B. Landscape incomplete at frontage.
8/8/07 approved per Cathy H.
7/8/08 - 1 year warranty - Look @ right turn lane only on Red Hills Parkway - approved per Ken B. |
| |
General Comments: |
|