[Fort Pierce Industrial Park-Phase 6]
Number: Grading-37964

Drawing of Record Submitted 4/17/2008..8/4/08 1 copy
Electronic Drawing 4/17/2008
Final Grading Report 5/1/2008
Date Scheduled 5/5/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/16/08 corrections required per Carson Tait. Need to clean the concrete off of all fire hydrants. Replace the broken grease zerk on one hydrant, replace all broken hydrant pads and meter box pads. Need to mark line sizes in all valve collars. (Some are marked 6" and they are 8"). Need to center the meter yokes in the meter boxes. A few yokes are too high and a few too low. Most problems are marked in blue paint. 6/9/2008 Approved per Barry Barnum 8/7/2008 Corrections required per Carson Tait.. Enterprise Drive,Missing meter box lid, formed pad,but not poured, clean concrete off of hydrant nozzles. 10/01/2008 Corrections requied per Carson Tait.. Need to get with Darren Judd and repair the locate wire in the areas where it will not trace correctly. 5/13/2009 Corrections required per Carson Tait.. 1 year warranty.. Need to make the locate wire work correctly. The areas where it will not trace are marked with blue paint.
Wastewater 5/16/08 corrections required per Carson Tait. Need to clean the concrete off of all fire hydrants. Replace the broken grease zerk on one hydrant, replace all broken hydrant pads and meter box pads. Need to mark line sizes in all valve collars. (Some are marked 6" and they are 8"). Need to center the meter yokes in the meter boxes. A few yokes are too high and a few too low. Most problems are marked in blue paint. 6/9/2008 Approved per Barry Barnum 8/7/2008 Corrections required per Carson Tait.. Enterprise Drive,Missing meter box lid, formed pad,but not poured, clean concrete off of hydrant nozzles. 10/01/2008 Corrections requied per Carson Tait.. Need to get with Darren Judd and repair the locate wire in the areas where it will not trace correctly. 5/13/2009 Corrections required per Carson Tait.. 1 year warranty.. Need to make the locate wire work correctly. The areas where it will not trace are marked with blue paint.
Engineering 5/7/2008 Corrections required Per Brandon Wiright.. Check grout in all DI boxes, need steps in all DI boxes, end of road markers, power & gas is not complete. 6/9/2008 Approved per Matt Loo 5/22/09 - 1 year warranty - approved per Brandon W.
City Development Engineer 5/5/2008 Approved per Ken Bricker 5/6/09 - 1 year warranty - approved per Ken B.
Landscaping 5/5/2008 Approved per Ken Bricker 5/13/09 - 1 year warranty - approved per Mark Goble.
    
General Comments: