[Crimson Cliffs Estates Phase II]
Number: Grading 1090

Drawing of Record Submitted 04/30/2003; 05/05/2003;05/13/2003
Electronic Drawing
Final Grading Report 04/30/2003
Date Scheduled 05/06/2003
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 3/18/04. N/A - per mark Bradley
Water 05/06/2003 Corrections Required per Kevin Condie. Valve in culdesac needs to be brought to grade. Need brass zirc in fire hydrant in culdesac. Need to check wire. 05/15/2003 Approved by Kevin Condie 3/18/04. Approved per Jeff Lance.
Wastewater 05/06/2003 Corrections Required per Kevin Condie. Valve in culdesac needs to be brought to grade. Need brass zirc in fire hydrant in culdesac. Need to check wire. 05/15/2003 Approved by Kevin Condie 3/18/04. Approved per Jeff Lance.
Engineering 05/06/2003. Corrections Required per Mike Hester. Correct the drawing of record. Shoulder the edge of pavement on the north side of 2000 South. Place end of road markers at the end of all roads that don`t go through. 06/09/2003. Approved per Judd. Plat is recorded Relocate the stop & stret name signs to the locataion shown on Drw 4-12 of the City Standards. Set property corner pins in the sidewalks. Remove all construction debris. Trim all high felt joints. Complete the electrical system. 05/02/2003 Approved per Mike Hester 05/14/2003. Approved per LH
City Development Engineer 05/06/2003 Correction Required. per Judd Burgess. Final plat needs to be recorded. 06/09/2003 Plat recorded - Approved for Permits per Jay Sandberg
Landscaping 05/06/2003 Approved per Mark Bradley.
    