Drawing of Record Submitted |
3/7/2008 |
Electronic Drawing |
3/7/2008 |
Final Grading Report |
3/17/2008 |
Date Scheduled |
3/18/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
3/18/2008 Approved per Dennis Wright |
Water |
3/19/2008 Approved per Carson Tait |
Wastewater |
3/19/2008 Approved per Carson Tait |
Engineering |
3/28/2008 Approved per Carlos Robles |
City Development Engineer |
3/18/08 corrections required per Cathy H. Electronic DWG of Record needs to be placed in city HCN system.
3/23/10 corrections required per Cathy H. Electronic DWG of record okay. per Ken B - Trash enclosure was never built (dumpster sits in parking lot). |
Landscaping |
3/18/08 corrections required per Ken B. Trash enclosure missing doors.
3/23/10 approved per Cathy H. |
| |
General Comments: |
|