| Drawing of Record Submitted | 3/7/2008 |
|---|---|
| Electronic Drawing | 3/7/2008 |
| Final Grading Report | 3/17/2008 |
| Date Scheduled | 3/18/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 3/18/2008 Approved per Dennis Wright |
| Water | 3/19/2008 Approved per Carson Tait |
| Wastewater | 3/19/2008 Approved per Carson Tait |
| Engineering | 3/28/2008 Approved per Carlos Robles |
| City Development Engineer | 3/18/08 corrections required per Cathy H. Electronic DWG of Record needs to be placed in city HCN system. 3/23/10 corrections required per Cathy H. Electronic DWG of record okay. per Ken B - Trash enclosure was never built (dumpster sits in parking lot). |
| Landscaping | 3/18/08 corrections required per Ken B. Trash enclosure missing doors. 3/23/10 approved per Cathy H. |
| General Comments: | |