River Park Commerical Phase 2..Bldg 5-6
Number: Grading-34661

Drawing of Record Submitted 01/18/2007
Electronic Drawing 01/18/2007..revised 05/04/2007
Final Grading Report 01/18/207
Date Scheduled 01/23/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 01/23/2007 Approved per Tim Dotson
Wastewater 01/23/2007 Approved per Tim Dotson
Engineering 01/30/2007 Approved per Carlos Robles
City Development Engineer 01/23/2007 Corrections required per Ken Bricker.Cathy H...1. Electronic Dwg of record-needs to be reinsubmitted in Autocad (Dwg)format. TIF images not acceptable. Construction materials still on site, asphalt chipped away from storm drain grids(not matching S/D grade). wall part. cap course is in/comp. 05/07/2007 Corrections required Per Ken Bricker..Broken curbing needs R/R cracks in curbing needs R/R asphalt spauling,contractor trailer on-site, building mat'l. still on site port-a-pot still on site cuts and cracks in asphalt in several locations. ( Sight distance is blocked in blocked by bushes at main entrance on River Road. 6/7/2007 Approved per Cathy H
Landscaping 01/23/2007 Approved per Ken Bricker
    
General Comments: