| Drawing of Record Submitted | 01/18/2007 |
|---|---|
| Electronic Drawing | 01/18/2007..revised 05/04/2007 |
| Final Grading Report | 01/18/207 |
| Date Scheduled | 01/23/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 01/23/2007 Approved per Tim Dotson |
| Wastewater | 01/23/2007 Approved per Tim Dotson |
| Engineering | 01/30/2007 Approved per Carlos Robles |
| City Development Engineer | 01/23/2007 Corrections required per Ken Bricker.Cathy H...1. Electronic Dwg of record-needs to be reinsubmitted in Autocad (Dwg)format. TIF images not acceptable. Construction materials still on site, asphalt chipped away from storm drain grids(not matching S/D grade). wall part. cap course is in/comp. 05/07/2007 Corrections required Per Ken Bricker..Broken curbing needs R/R cracks in curbing needs R/R asphalt spauling,contractor trailer on-site, building mat'l. still on site port-a-pot still on site cuts and cracks in asphalt in several locations. ( Sight distance is blocked in blocked by bushes at main entrance on River Road. 6/7/2007 Approved per Cathy H |
| Landscaping | 01/23/2007 Approved per Ken Bricker |
| General Comments: | |