| Drawing of Record Submitted | 10/07/2008..revised 10/28/08 |
|---|---|
| Electronic Drawing | 10/07/2008..revised 10/28/08 |
| Final Grading Report | 10/03/2008 |
| Date Scheduled | 10/08/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 10/10/2008 Corrections required per Dennis Wright.. NOT READY (Will hang on to inspection card until next week) 10/15/2008 Approved per Dennis Wright 9/28/09 - 1 year warranty - approved per Dennis W. |
| Water | 10/10/2008 Approved per Carson Tait wire good 11/10/2009 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 10/10/2008 Approved per Carson Tait wire good 11/10/2009 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 10/08/08 Corrections required per Carlos Robles.. Light post need to be in. 10/2/09 - 1 year warranty - approved per Brandon Wright. |
| City Development Engineer | 10/8/08 corrections required per Cathy H. Electronic DWG of record - show rock walls on As-Builts DWGS. Rock Walls need to be installed. Provide rock wall certifications. Provide 10% warranty Bond. per Ken B. Missing street light, extend asphalt to end of apron at both street stubs. 10/29/08 corrections required per Cathy H. Provide Rock Wall Certifications. Provide 10% warranty bond. 10/1/09 - 1 year warranty - approved per Cathy H. |
| Landscaping | 10/8/08 approved per Ken B. 10/1/09 - 1 year warranty - approved per Cathy H. |
| General Comments: | |