{Escalera Phase 3}
Number: Grading-40585

Drawing of Record Submitted 10/07/2008..revised 10/28/08
Electronic Drawing 10/07/2008..revised 10/28/08
Final Grading Report 10/03/2008
Date Scheduled 10/08/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 10/10/2008 Corrections required per Dennis Wright.. NOT READY (Will hang on to inspection card until next week) 10/15/2008 Approved per Dennis Wright 9/28/09 - 1 year warranty - approved per Dennis W.
Water 10/10/2008 Approved per Carson Tait wire good 11/10/2009 Approved per Kevin Condie.. 1 year warranty
Wastewater 10/10/2008 Approved per Carson Tait wire good 11/10/2009 Approved per Kevin Condie.. 1 year warranty
Engineering 10/08/08 Corrections required per Carlos Robles.. Light post need to be in. 10/2/09 - 1 year warranty - approved per Brandon Wright.
City Development Engineer 10/8/08 corrections required per Cathy H. Electronic DWG of record - show rock walls on As-Builts DWGS. Rock Walls need to be installed. Provide rock wall certifications. Provide 10% warranty Bond. per Ken B. Missing street light, extend asphalt to end of apron at both street stubs. 10/29/08 corrections required per Cathy H. Provide Rock Wall Certifications. Provide 10% warranty bond. 10/1/09 - 1 year warranty - approved per Cathy H.
Landscaping 10/8/08 approved per Ken B. 10/1/09 - 1 year warranty - approved per Cathy H.
    
General Comments: