| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | Hillside Restoration Bond (Irrevocable Letter Of Credit) provided for restoration as per Hillside Ordinance. Expires July 16, 2003. Verification of Compliance Required prior to final inspection. |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 8/22/2003. Approved per Dennis Wright. 12/06/2004 Approved per Dennis 1 year warraty inspection |
| Water | 8/7/2003. Corrections required per Jeff Lance. Not ready. 08/18/2003.Corrections required per Jeff Lance. Turn all fire hydrants to street, fix everything marked in white paint,lots #106,#107,,fire hydrent needs straightened. Remove concrete off of meter boxe lids. Still need to check wire. 8/26/03 NOT APPROVED. Corrections required per Jeff Lance. lets 106&107 broken meter box. Clean concrete off fire hydrant lot 45. Lot 89 box is in drive way, need traffic box. need bigger arrows in fire hydrant close to entrance. 8/27/2003. Approved Per Jeff Lance |
| Wastewater | 8/7/2003. Corrections required per Jeff Lance. Not ready. 08/18/2003.Corrections required per Jeff Lance. Turn all fire hydrants to street, fix everything marked in white paint,lots #106,#107,,fire hydrent needs straightened. Remove concrete off of meter boxe lids. Still need to check wire. 8/26/03 NOT APPROVED. Corrections required per Jeff Lance. lets 106&107 broken meter box. Clean concrete off fire hydrant lot 45. Lot 89 box is in drive way, need traffic box. need bigger arrows in fire hydrant close to entrance. 8/27/2003. Approved Per Jeff Lance |
| Engineering | 08/06/2003. Corrections required per Larry Henderson. trim expansion joints. Seal cracks in curbs, repave intersection of Castle Rock & Cascade canyon, Clean off spilled concrete, Patch chips in curb, move water meters out of drive or replace with traffic boxes & lids,clean out & grout inside of inlet boxes, finish sidewalk, clean streets,curbs, ;and sidewalksd, clean manhole rings so lids don`t rattle 08/19/2003. Corrections required per Larry H. Trim expansion joints, seal chips in curb,clean out & grout inside of inlet boxes,move water meters out of driveways or replace with traffic boxes & lids,clean manhole rings so lids don`t rattle. 8/21/2003. APPROVED per Larry Henderson. |
| City Development Engineer | 08/06/2003. Corrections required per Cathie Hasfurther. electronic drawing of recorded needed. 8/27/2003. Approved per Cathie Hasfurther. |
| Landscaping | 08/08/2003. Corrections required per Doug Wolfenstein.No trees Need street trees. 8/26/2003. Approved Douge - 90 Days Millo. 05/13/2004. Approved per Lynne Scott. As per letter from Milo McCowan, dated 5/13/04. Finish landscaping and trail by 6/15/04. |
| General Comments: | |
| Hillside Ordinance "Verification of Compliance" required before final of development! | |