[Marriot Townplace Suites]
Number: Grading-38136

Drawing of Record Submitted 4/3/2008
Electronic Drawing 4/3/2008
Final Grading Report 4/3/2008
Date Scheduled 4/9/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 4/9/08 approved per Dennis W. 3/3/2009 Approved per Dennis Wright.. 1 year warranty
Water 4/9/08 approved per Carson Tait. 3/13/2009 Approved per Carson Tait..1 year warranty. Wire is good
Wastewater 4/9/08 approved per Carson Tait. 3/13/2009 Approved per Carson Tait..1 year warranty. Wire is good
Engineering 4/16/2008 Approved Per Carlos Robles 3/26/2009 Approved per Carlos Robles.. 1 year warranty
City Development Engineer 4/9/08 corrections required per Cathy H. Electronic dwg of record needs to be placed in city HCN system. Drainage system needs to be shown with all information (pipe size, slope, inverts, etc). Show detention etc. Show wall locations on both electronic and paper dwg of record. Hillside compliance letter. 10% warranty bond on public improvements. Rockwall construction checklist. per Ken B. Gravel piles in road. Port-a-potty and office trail is still on site. Storage trailers on site. Sidewalks under construction. ADA signage is needed. 4/17/08 corrections required per Cathy H. Hillside compliance letter. 10% warranty bond on public improvements. Rockwall construction checklist. 4/21/08 corrections required per Cathy H. Hillside compliance letter. 10% warranty bond on public improvements. Rockwall construction checklist. 4/25/08 corrections required per Cathy H. Roped off - cannot determine if part of bldg of site work. per Ken B. Driveport still under construction. 4/29/08 approved per Ken B - Reseat storm drain grid at front. 3/3/2009 Approved per Cahty H.. 1 year warranty Check only public street improvements along 1470 East Street
Landscaping 4/9/08 corrections required per Ken B. Gravel piles in road. Port-a-potty and office trail is still on site. Storage trailers on site. Sidewalks under construction. ADA signage is needed. 4/16/08 corrections required per Ken B. landscaping is missing at terraces of stacked rock walls in the rear. 4/21/08 corrections required per Ken B. (2) port-a-pots and utility trailer still on site. Trash trailer on site. Carport floor still drying. Heavy equipment still on site. 4/25/08 approved per Cathy H. 3/4/2009 Approved per Pam Klotz.. 1 year warranty.. Tree stakes need to be removed or loosened as needed..pam 703-0941
    
General Comments: