| Drawing of Record Submitted | 8/06/2014 |
|---|---|
| Electronic Drawing | 8/06/2014 |
| Final Grading Report | |
| Date Scheduled | 7/31/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 7/30/2014 Approved per Dennis Wright |
| Water | 8/05/2014 Corrections required per Carson Tait.. Need to have the as-built drawing in hand in order to do the Final Inspection 8/13/2014 Approved per Carson Tait |
| Wastewater | 8/05/2014 Corrections required per Carson Tait.. Need to have the as-built drawing in hand in order to do the Final Inspection 8/13/2014 Approved per Carson Tait |
| Engineering | 8/04/2014 Approved per Lonnie Sullivan |
| City Development Engineer | 8/04/2014 Approved per Jared Stewart... STREETS DEPT ONLY |
| Landscaping | |
| General Comments: | |