[Vista Del Cielo]
Number: Grading-38167

Drawing of Record Submitted 12/10/2007
Electronic Drawing 12/10/2007
Final Grading Report 12/07/2007
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/14/2007 Corrections required per Wayne M..Need to paint Fire Hyd down to the concrete and need a put a extension on the valve to the Fire Hyd, it is to deep a valve key a 2 or 3 Ft extension will work fine. 1/10/2008 Approved per Wayne M.. Corrections have been made 12/17/08 - 1 year warranty - approved per Daren Judd - Wire good.
Wastewater 12/14/2007 Corrections required per Wayne M..Need to paint Fire Hyd down to the concrete and need a put a extension on the valve to the Fire Hyd, it is to deep a valve key a 2 or 3 Ft extension will work fine. 1/10/2008 Approved per Wayne M.. Corrections have been made 12/17/08 - 1 year warranty - approved per Daren Judd - Wire good.
Engineering 12/14/2007 Corrections required per Carlos Robles.. Need to remove bad asphalt 1/11/2008 Corrections required.. per Carlos.. fix asphalt 1/31/2008 Approved Per Carlos Robles
City Development Engineer 12/13/07 approved per Ken B 12/4/08 - 1 year warranty - approved per Ken B.
Landscaping 12/13/07 approved per Ken B 12/08/2008 Corrections required ..Per Laura Taylor 1 year warranty.. Remove tree stakes & guy wires around trunks. Remove sidewalk form w/metal spikes at back of walk radius NE quadrant of 1450 S & 2580 E. No sign indicating name of project
    
General Comments: