Drawing of Record Submitted |
9/21/2007 |
Electronic Drawing |
9/21/2007..9/28/2007 revised |
Final Grading Report |
9/21/2007 |
Date Scheduled |
9/26/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
9/27/2007 Corrections required per Carson Tait..Need to raise the back flow assembly one foot hgher than the highest head or emitter.
10/1/07 approved for Carson Tait.
10/01/2008 Corrections required per Carson Tait.. 1 yr warranty.. Wire not good need to repair the locate wire |
Wastewater |
9/27/2007 Corrections required per Carson Tait..Need to raise the back flow assembly one foot hgher than the highest head or emitter.
10/1/07 approved for Carson Tait.
10/01/2008 Corrections required per Carson Tait.. 1 yr warranty.. Wire not good need to repair the locate wire |
Engineering |
9/27/2007 Corrections required per Brandon Wright.. Need Drawing of Record, broken curb around DI in front (4340) replace.
10/1/07 approved per Brandon W. |
City Development Engineer |
9/26/07 corrections required per Cathy H. Electronic DWG of record needs to be in DWG format not DWF. It also needs to be in the city HCN system. Provide one DWG that has all information (sewer laterals) need to have ties from TBC and bldg corner or something). Also need inverts, pipe type, etc. for any storm drain. per Ken Bricker, port-a-pot still on site. Construction material laying on loading dock slope. Chain link for trash enclosure, no CMU walls and NO solid doors.
10/1/07 corrections required per Ken B. No CMU construction at trash enclosure and no solid doors present on trash enclosure. Scrap metal on back door ramp.
10/2/07 approved per Ken B.
9/10/2008 Approved Per Cathy H..1yr warranty City & Parks..No public street improvments |
Landscaping |
9/26/07 corrections required per Cathy H. Electronic DWG of record needs to be in DWG format not DWF. It also needs to be in the city HCN system. Provide one DWG that has all information (sewer laterals) need to have ties from TBC and bldg corner or something). Also need inverts, pipe type, etc. for any storm drain. per Ken Bricker, port-a-pot still on site. Construction material laying on loading dock slope. Chain link for trash enclosure, no CMU walls and NO solid doors.
10/1/07 corrections required per Ken B. No CMU construction at trash enclosure and no solid doors present on trash enclosure. Scrap metal on back door ramp.
10/2/07 approved per Ken B.
9/10/2008 Approved per Cathy H..1yr warranty City & Parks..No public street improvments |
| |
General Comments: |
|