| Drawing of Record Submitted | 03/14/2007 |
|---|---|
| Electronic Drawing | 03/14/2007 |
| Final Grading Report | 03/14/2007..revised 04/04/2007 |
| Date Scheduled | 3/20/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 03/30/2007 Approved per Wayne M.. Made all corrections 3/7/2008 Approved per Carson Tait.. 1 yr warranty.. Wire ok |
| Wastewater | 03/30/2007 Approved per Wayne M.. Made all corrections 3/7/2008 Approved per Carson Tait.. 1 yr warranty.. Wire ok |
| Engineering | 03/21/2007 Corrections required per Carlos R.. End of Road Markers.. Access road needs to be relocated. 04/02/2007 Approved per Carlos Robles 3/10/2008 Corrections required per Brandon Wright.. 1 yr warranty.. Settling around West DI box on Venture Drive.. Chipped Curb |
| City Development Engineer | 3/21/07 Corrections required per Jay Sandberg. Needs to be relocated at a 90 degree with 1630 E. End of road markers missing. Curbs covered with gravel piles. 3/27/07 corrections required per Jay Sandberg. Water standing in parking lot low spot, end of road markers are missing, access road (across street) has not been relocated as required. 03/30/2007 Approved per Jay Sandberg 3/6/08 - 1 year warranty - approved per Ken B. |
| Landscaping | 3/21/07 Corrections required per Ken B. Landscape still being installed. 3/27/07 corrections required per Ken B. Landscape is incomplete. 03/30/2007 Approved per Jay Sandberg 3/6/08 - 1 year warranty - approved per Ken B. |
| General Comments: | |