| Drawing of Record Submitted | 1/9/2008..1/22/2008(1) |
|---|---|
| Electronic Drawing | 1/9/2008..1/22/2008 |
| Final Grading Report | 1/9/2008 |
| Date Scheduled | 1/14/2008 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 1/18/2008 Approved Per Rick 1/22/2008 Approved per Dennis Wright 12/04/2008 Approved per 1 year warranty Per Dennis Wright |
| Water | 1/17/2008 Approved per Carson Trait 12/17/08 - 1 year warranty - approved per Daren Judd - Good. |
| Wastewater | 1/17/2008 Approved per Carson Trait 12/17/08 - 1 year warranty - approved per Daren Judd - Good. |
| Engineering | 1/16/2008 Corrections required per Carlos Robles..Handicap ramp does not meet City specs. Fix broken sidewalk and curb, remove broken sidewalk. 1/18/2008 Approved per Carlos Robles 1/6/2009 Approved per Carlos Robles.. 1 year warranty |
| City Development Engineer | 2/20/07 Corrections required per Cathy H. Electronic dwg of record still needs to show storm drain info. Per Ken B. Security is still beging installed. Landscape incomplete. 1/14/08 corrections required per Cathy H. Electronic dwg of record - provide all as-built points, monuments, drainage improvements (inverts, rims, pipe size, pipe type, length, slope, etc). Show improvements as installed (not to be relocated etc). 1/22/08 approved per Cathy H. 12/5/08 - 1 year warranty - check only public roadways - 320 E & Sunland Dr - Approved per Cathy H. |
| Landscaping | 1/14/08 approved per Ken B. 11/08/2008 Approved per Larry Shane.. 1 year warranty |
| General Comments: | |