| Drawing of Record Submitted | 9/4/2012 |
|---|---|
| Electronic Drawing | 9/04/2012 |
| Final Grading Report | |
| Date Scheduled | 9/06/2012 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 9/07/2012 Corrections required per Kevin COndie.. Test back flow on Irr & Fire system concrete around hydrant & meter valve collar w/arrows & sizes check wie paint hydrant |
| Wastewater | 9/07/2012 Corrections required per Kevin COndie.. Test back flow on Irr & Fire system concrete around hydrant & meter valve collar w/arrows & sizes check wie paint hydrant |
| Engineering | 9/6/12 corrections required per Brandon W. Trash enclosure was not built per plan. |
| City Development Engineer | 9/6/12 corrections required per Brandon W. Trash enclosure was not built per plan. 9/7/2012 Approved per Ed Welch.. STREETS DEPT only.. No storm drain to streets |
| Landscaping | 9/6/12 corrections required per Brandon W. Trash enclosure was not built per plan. |
| General Comments: | |