Drawing of Record Submitted |
6/4/2007 |
Electronic Drawing |
6/4/2007..revised 6/14/2007 |
Final Grading Report |
6/8/2007 |
Date Scheduled |
6/11/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
6/11/2007 Approved per Dennis Wright
5/7/2008 Approved per Dennis Wright.. 1 yr warranty |
Water |
6/11/07 corrections required per Carson Tait. Need to repair the South hydrant, it leaks at the break away flanges. Add a three foot extension onto the valve nut (it is too deep). Need to add rebar to the meter box. Need to raise the meter box. It is resting on top of the pipe. Replace both of the concrete pads around the fire hydrants. They are both cracked. They should last longer than one week.
7/14/2007 Approved per Carson Tait. |
Wastewater |
6/11/07 corrections required per Carson Tait. Need to repair the South hydrant, it leaks at the break away flanges. Add a three foot extension onto the valve nut (it is too deep). Need to add rebar to the meter box. Need to raise the meter box. It is resting on top of the pipe. Replace both of the concrete pads around the fire hydrants. They are both cracked. They should last longer than one week.
7/14/2007 Approved per Carson Tait. |
Engineering |
6/12/2007 Corrections required per Carlos R.. Finish project,cleanup site, finish parkway lot
6/14/2007 Approved per Carlos Robles
5/12/2008 Approved per Carlos Robles 1 yr warranty
|
City Development Engineer |
6/11/07 corrections required per Cathy H. Electronic dwg of record needs to be placed in the city HCN system; sewer lateral on as-built that does not match as built pts. per Ken B - Asphalt is patched and spauling in several spots.
6/14/2007 Approved per Cathy H
5/7/08 - 1 year warranty - approved per Cathy H. |
Landscaping |
6/11/07 approved per Ken B.
5/7/08 - 1 year warranty - approved per Cathy H. |
| |
General Comments: |
|