[Hawk Hollow Phase II]
Number: Grading 1131

Drawing of Record Submitted 05/13/03, 05/28/2003, 06/05/2003
Electronic Drawing
Final Grading Report 05/13/03
Date Scheduled 05/15/03
BUILDING PERMIT RELEASE APPROVALS
Power 05/06/2003 Approved per Don Higgins for permits only.Power may be a couple of weeks out.
Water 05/01/2003. Approved per Kevin Condie for Permits Only.
Wastewater 05/01/2003. Approved per Kevin Condie for Permits Only.
Engineering 05/01/2003. Approved per Mike Hester for Permits Only.
City Development Engineer 05/01/2003. Approved per Cathie Hasfurther for permits only. 05/16/2003. Corrections required electronic drawing of record
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 05/16/2003. Power approved by Don Higgins 05/23/2003. Corrections required. Electronic drawing of record per Cathie Hasfurther 06/17/2003. Approved per Don H.Power OK
Water 05/15/2003. Corrections needed per Kevin L. Replace broken collor around meter box Need to check wire 05/23/2003. Approved per Kevin C.
Wastewater 05/15/2003. Corrections needed per Kevin L. Replace broken collor around meter box Need to check wire 05/23/2003. Approved per Kevin C.
Engineering 5/13/2003. Correstions needed. final grading report drawing of record remove construction material from gutter grade detention basin clean gutters 6/11/2003. approved per Catherine Hasfuther 06/06/2003. Approved per Moike Hester install street name & stop sign clean meter box lids per LA 05/23/2003. Correction required, per MEA Provide an account drawing of record 06/11/2003. approved per Cathie Hasfurther
City Development Engineer
Landscaping 05/16/03. Need to install trees per Mark Bradley
    
General Comments: