| Drawing of Record Submitted | 05/02/2007 |
|---|---|
| Electronic Drawing | 05/02/2007 |
| Final Grading Report | 05/02/2007 |
| Date Scheduled | 05/07/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 05/08/2007 Approved per Wayne M.. Corrections have been made 5/13/08 - 1 year warranty - approved per Carson Tait. |
| Wastewater | 05/08/2007 Approved per Wayne M.. Corrections have been made 5/13/08 - 1 year warranty - approved per Carson Tait. |
| Engineering | 5/7/07 approved per Carlos R. 5/8/08 - 1 year warranty - corrections required per Brandon Wright. Patch and seal chips and crack in curb and gutters on city Right of Way - also in cross gutters. |
| City Development Engineer | 5/4/07 corrections required per Ken B - parking/storage yard has (3) storm drain grate elevated above grade and will not drain. Still wiring building - while labor is owrking for the business materials and equipment stored on site, manufacturing has already been in progress and is at present. 6/5/2007 Corrections required Per Ken Bricker.. Hole in the ground next to storm drain in parking lot. 6/19/07 approved per Ken B. 5/7/08 - 1 year warranty - approved per Cathy H. |
| Landscaping | 5/4/07 Approved per Ken B.5/7/08 - 1 year warranty - approved per Cathy H. |
| General Comments: | |