Drawing of Record Submitted |
12/11/2007 |
Electronic Drawing |
12/11/2007 |
Final Grading Report |
12/11/2007 |
Date Scheduled |
12/17/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/18/2007 Corrections required per Wayne M.. Need to cut arrows into valve collars and pipe size the valve in the road need wire in the valve can and need to have back flow for Irr tested and Fire system back flow tested.
12/20/2007 Approved per Carson Tait
11/05/2008 Approved per Carson Tait.. 1yr warranty |
Wastewater |
12/18/2007 Corrections required per Wayne M.. Need to cut arrows into valve collars and pipe size the valve in the road need wire in the valve can and need to have back flow for Irr tested and Fire system back flow tested.
12/20/2007 Approved per Carson Tait
11/05/2008 Approved per Carson Tait.. 1yr warranty |
Engineering |
12/17/2007 Corrections required per Brandon Wright..Storm drain not built per plan stop sign needed.
12/20/2007 Approved per Brandon Wright
11/05/2008 Approved per Brandon Wright 1 yr warranty |
City Development Engineer |
12/17/07 corrections required per Cathy H. Electronic dwg of record - drainage needs to be shown per approved plans. per Ken B. No trash enclosure built on site. Landscape is incomplete at frontage. Boulders in 10' clear zone at frontage.
12/21/2007 Approved per Ken Bricker
11/4/08 - 1 year warranty - approved per Cathy H- No public improvements. |
Landscaping |
12/17/07 corrections required per Ken B. No trash enclosure built on site. Landscape is incomplete at frontage. Boulders in 10' clear zone at frontage.
12/21/2007 Approved per Ken Bricker
11/20/2008 Approved per Larry Shane.. 1 year warranty |
| |
General Comments: |
|