[Ft Pierce Bringhurst Plumbing #79]
Number: Grading-38701

Drawing of Record Submitted 12/11/2007
Electronic Drawing 12/11/2007
Final Grading Report 12/11/2007
Date Scheduled 12/17/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/18/2007 Corrections required per Wayne M.. Need to cut arrows into valve collars and pipe size the valve in the road need wire in the valve can and need to have back flow for Irr tested and Fire system back flow tested. 12/20/2007 Approved per Carson Tait 11/05/2008 Approved per Carson Tait.. 1yr warranty
Wastewater 12/18/2007 Corrections required per Wayne M.. Need to cut arrows into valve collars and pipe size the valve in the road need wire in the valve can and need to have back flow for Irr tested and Fire system back flow tested. 12/20/2007 Approved per Carson Tait 11/05/2008 Approved per Carson Tait.. 1yr warranty
Engineering 12/17/2007 Corrections required per Brandon Wright..Storm drain not built per plan stop sign needed. 12/20/2007 Approved per Brandon Wright 11/05/2008 Approved per Brandon Wright 1 yr warranty
City Development Engineer 12/17/07 corrections required per Cathy H. Electronic dwg of record - drainage needs to be shown per approved plans. per Ken B. No trash enclosure built on site. Landscape is incomplete at frontage. Boulders in 10' clear zone at frontage. 12/21/2007 Approved per Ken Bricker 11/4/08 - 1 year warranty - approved per Cathy H- No public improvements.
Landscaping 12/17/07 corrections required per Ken B. No trash enclosure built on site. Landscape is incomplete at frontage. Boulders in 10' clear zone at frontage. 12/21/2007 Approved per Ken Bricker 11/20/2008 Approved per Larry Shane.. 1 year warranty
    
General Comments: