Tonaquint Center Development (WORKMAN'S COMP)Phase 3
Number: Grading-38714

Drawing of Record Submitted 7/30/2007
Electronic Drawing 7/30/2007
Final Grading Report 8/7/2007
Date Scheduled 8/9/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 8/8/07 approved per Dennis W.
Water 8/8/07 corrections required per Darrin Judd - cut arrows for line direction in concrete collars around cans. Also cut pipe size in concrete collars. 8/17/2007 Approved per Darrin
Wastewater 8/8/07 corrections required per Darrin Judd - cut arrows for line direction in concrete collars around cans. Also cut pipe size in concrete collars. 8/17/2007 Approved per Darrin
Engineering 8/15/2007 Approved per Brandon Wright
City Development Engineer 8/8/07 corrections required per Cathy H. Electronic DWG of record will not open - need file in AutoCad Format and in city HCN system. 8/22/07 corrections required per Ken B. Missing S/W square at frontage.
Landscaping 8/8/07 corrections required per Ken B.Landscape still being installed. Port-a-pot still on site. 8/22/07 approved per Ken B.
    
General Comments: