[Meadow Valley Est. Phase 5 & 8]
Number: Grading-38794

Drawing of Record Submitted 4/17/2008..revised 5/2/2008
Electronic Drawing 4/17/2008
Final Grading Report 4/18/2008
Date Scheduled 4/22/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 4/29/2008 Approved per Carson Tait 5/7/2009 Approved per Carson Tait..1 year warranty
Wastewater 4/29/2008 Approved per Carson Tait 5/7/2009 Approved per Carson Tait..1 year warranty
Engineering 4/28/2008 Corrections required per Carlos Robles.. Fix storm drain 5/5/2008 Approved per Carlos Robles 5/19/09 - 1 year warranty - approved per Carlos R.
City Development Engineer 4/21/08 corrections required per Cathy H. Electronic DWG of record - show rock walls on plan. 10% warranty bond. Rock wall certifications. 4/29/08 corrections required per Cathy H. Electronic DWG of record - show rock walls on plan. 10% warranty bond. Rock wall certifications. 5/5/08 corrections required per Cathy H. Electronic DWG of record - show rock walls on plan. 10% warranty bond. Rock wall certifications. 6/2/2008 Corrections required per Cathy H...Electronic Dwg of record-see previous comments, Rockwall certifications. 6/3/08 approved per Cathy H. 5/6/09 - 1 year warranty - approved per Ken B.
Landscaping 4/21/08 corrections required per Ken B. Trail street entrance has green concrete with forms present. Fire hydrant pads still have forms present. 4/29/08 approved per Ken B. 5/13/09 - 1 year warranty - corrections required per Mark Goble - No landscaping or irrigation installed as shown on plan. ADA ramps for asphalt trail are cracked. Ramp on 2350 E and ramp on 2400 E West side of road. 9/22/09 - 1 year warranty - approved per Cathy H.
    
General Comments: