[Red Butte Estates Phase II]
Number: Grading 28533

Drawing of Record Submitted 05/12/2003, 05/28/2003
Electronic Drawing
Final Grading Report 05/12/2003
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/16/2003. Corrections needed per Kevin Meter boxes w/rc on them remove concrete form box raise to meter betters clean one meter box clean hydrant & paint if needed 06/12/2003. approved per Kevin 09/08/2003. approved per Jeff Lance. 06/11/2003. Approved per Kevin Condie Approved per Kevin Condie 06/11/2003.approved per Kevin Condie need to find old service on 2450 So & remove meter & abondon at main 06/06/2003. approved per Kevin on as built wc need to show how water goes under 18" line in 2450 So Stub lines need (apor plug put on them)
Wastewater 5/16/2003. Corrections needed per Kevin Meter boxes w/rc on them remove concrete form box raise to meter betters clean one meter box clean hydrant & paint if needed 06/12/2003. approved per Kevin 09/08/2003. approved per Jeff Lance. 06/11/2003. Approved per Kevin Condie Approved per Kevin Condie 06/11/2003.approved per Kevin Condie need to find old service on 2450 So & remove meter & abondon at main 06/06/2003. approved per Kevin on as built wc need to show how water goes under 18" line in 2450 So Stub lines need (apor plug put on them)
Engineering 05/13/2003 Corrections required per Larry Henderson trim expansion joints sight distance onto 2450 so blocked by walls, east & west install street lights 06/17/2003. Approved per Cathie Hasfurther. 06/17/2003. Approved per Mike Hester 05/29/2003. Corrections requiredPer Mike Heston 1. Clean the public improvements 2. use two chevrons and paint the closing tapon on 2450 South. 3. Place rip rap at the S.D. outlet. 4. Complete the electrical. 5. Backfill all sidewalks. ramp ends of sidewalk complete paving on west end of 2450 so reset lot corners remove dirt ramp on westside of 2160 so remove boards from gutter on 2160 E& 2450 So shoulder asphalt taper on 2450 So. backfill trench on So. side of 2450 So(safety hazzard) complete landscaping on 2450 So. holes are safety hazzard -more items may be added- set section cornor per City Surveyer 5-13-03 9/2/2003. Corrections Required per Mike hester. Install all property ?corners. Backfill all sidewalks; replace damaged ADA ramp as marked in phase I and side walk. Grout under the street light bars. Clean all storm drain boxes and remove excess concrete around the pipes. Recompact the sink hole and repair the asphalt on the n/w storm box on 2660 S. finish the dentintion basion. Fix the "BIG HOLE" in the pavement. 09/09/2003. Approved per Mike Hester.
City Development Engineer 05/14/2003 Corrections Required per Cathie Hasfurther Need electronic drawing of record 11/25/03. Approved per Cathy.
Landscaping 05/16/2003. Correction required per Mark Bradley Trees need to be installed. 05/20/2003.Approved for Trees only per Matt Callister, further approval in needed for City Maintence of row landscaping. *Why is row landscarpe strip less then four feet? 8/29/2003. APPROVED per Mark Bradley
    
General Comments: