| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve. |
| Wastewater | 5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve. |
| Engineering | |
| City Development Engineer | 5/29/2007 Corrections required per Jay Sandberg.. Bridge structure only-see report from Engineer and Landmark testing. Drawing of record to be submitted when asphalt,railing, and rip-rap is complete with subdivision |
| Landscaping | |
| General Comments: | |