BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve. |
Wastewater |
5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve. |
Engineering |
|
City Development Engineer |
5/29/2007 Corrections required per Jay Sandberg.. Bridge structure only-see report from Engineer and Landmark testing. Drawing of record to be submitted when asphalt,railing, and rip-rap is complete with subdivision |
Landscaping |
|
| |
General Comments: |
|