[Arrowhead Canyon Bridge(Sun River)]
Number: Tracking-38829

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve.
Wastewater 5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve.
Engineering
City Development Engineer 5/29/2007 Corrections required per Jay Sandberg.. Bridge structure only-see report from Engineer and Landmark testing. Drawing of record to be submitted when asphalt,railing, and rip-rap is complete with subdivision
Landscaping
    
General Comments: