Drawing of Record Submitted |
8/22/2007..revised 8/24/2007 |
Electronic Drawing |
8/22/2007..revised 8/24/2007 |
Final Grading Report |
8/22/2007 |
Date Scheduled |
8/23/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
8/24/2007 Approved per Dennis Wright
8/5/2008 Approved per Dennis Wright 1 yr warranty |
Water |
8/24/07 corrections required per Dustin Bracken - Valve collars need to be repoured to spec. Wire from Main St to buildin gneeds to be repaired and retested. Hydrants and 2" meter box need concrete, front hyd needs a 6" riser.
8/30/2007Corrections required per Kevin Condie..Wire needs to be fixed between main and staple.. need to cap tee on old line, lie it show on plans.2" construction water behind meter need to be cap below ground
9/11/2007 Approved per Kevin Condie
8/28/2008 Approved per Kevin Condie.. 1 yr warranty.. wire ok |
Wastewater |
8/24/07 corrections required per Dustin Bracken - Valve collars need to be repoured to spec. Wire from Main St to buildin gneeds to be repaired and retested. Hydrants and 2" meter box need concrete, front hyd needs a 6" riser.
8/30/2007Corrections required per Kevin Condie..Wire needs to be fixed between main and staple.. need to cap tee on old line, lie it show on plans.2" construction water behind meter need to be cap below ground
9/11/2007 Approved per Kevin Condie
8/28/2008 Approved per Kevin Condie.. 1 yr warranty.. wire ok |
Engineering |
8/24/2007 Approved per Brandon Wright.. Not enough field den on water and sewer no storm drain test, 1 year warranty required on utiliity trenches on main street.
8/6/07 - 1 year warranty - Corrections required per Brandon W. Change manhole lid on storm drain (sewer lid). |
City Development Engineer |
8/23/07 corrections required per Cathy H. Electronic DWG of record needs to shift East and South to meet city HCN. Storm drain line missing going to the East on electronic DWG of record connecting to sidewalk drain. Address on building incorrect. per Ken B - silt fence needs removed in back, both fire hydrants are missing pads, large dumpster is still on site.
8/27/07 corrections required per Ken B. Concrete forms are in-place, no concrete present.
8/30/07 approved Per Ken B. This inspection must comply with all city of St George standards.
8/5/08 - 1 year warranty - Private improvements - N/A. |
Landscaping |
8/23/07 approved per Ken B.
8/30/07 approved Per Ken B. This inspection must comply with all city of St George standards.
8/5/08 - 1 year warranty - Private improvements - N/A. |
| |
General Comments: |
|