Drawing of Record Submitted |
4/03/2008 |
Electronic Drawing |
4/3/2008 |
Final Grading Report |
4/3/2008 |
Date Scheduled |
4/8/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/8/08 approved per Carson Tait - Lower Hydrant Pad.
5/6/2009 Approved per Carson Tait. 1 year warranty |
Wastewater |
4/8/08 approved per Carson Tait - Lower Hydrant Pad.
5/6/2009 Approved per Carson Tait. 1 year warranty |
Engineering |
4/10/08 approved per Brandon Wright.
5/8/2009 Corrections required per Brandon Wright.. 1 year warranty.. Landscape and detention needs to be maintained |
City Development Engineer |
4/8/08 corrections required per Cathy H. Electronic DWG of record needs to show how drainage gets from detention to public facilities. per Ken B. Fire hydrant requires pad. No trash enclosure built. Power cabinet is blocking sight distance at street access.
6/2/08 approved per Cathy H.
5/6/09 - 1 year warranty - Not applicable - No public improvements - per Cathy H. |
Landscaping |
4/8/08 corrections required per Ken B. Fire hydrant requires pad. No trash enclosure built. Power cabinet is blocking sight distance at street access.
6/2/08 approved per Ken B.
6/11/2009 Approved Per Laura Taylor.. 1 year warranty |
| |
General Comments: |
|