Drawing of Record Submitted |
3/19/2008 |
Electronic Drawing |
3/19/2008 |
Final Grading Report |
3/18/2008 |
Date Scheduled |
3/20/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
3/24/2008 Corrections required per Carson Tait..Need to cut line sizes and direction of flow arrows into the concrete collars and pads. Test and tag back flow assemblies. remove the unprotected hose bib from the supply side of the outside r-p riser.
4/2/2008 Approved per Carson Tait
3/13/2009 Approved per Carson Tait.. 1 year warranty.. Wire is good |
Wastewater |
3/24/2008 Corrections required per Carson Tait..Need to cut line sizes and direction of flow arrows into the concrete collars and pads. Test and tag back flow assemblies. remove the unprotected hose bib from the supply side of the outside r-p riser.
4/2/2008 Approved per Carson Tait
3/13/2009 Approved per Carson Tait.. 1 year warranty.. Wire is good |
Engineering |
3/20/2008 Corrections required per Brandon Wrght..Dumpster needs solid metal doors per plan, storm drain boxes trim pipe and grout, landscape boulders need to be 10' behind curb.
4/3/2008 Corrections required per Brandon Wright..Storm drain boxes-trim pipe & grout, solid doors on dumpster enclosure not installed, landscape boulders in front still need to be removed from 10' clear zone.
4/8/08 corrections required per Brandon W. Not ready - no change.
4/9/08 corrections required per Brandon W. No changes have been made on list.
4/10/08 approved per Brandon W.
3/18/2009 Approved per Brandon Wright.. 1 year warranty |
City Development Engineer |
3/19/08 corrections required per Cathy H. Electronic DWG of record is missing junction boxes and info. Extension of drainage system to existing storm drain and all pipe sizes and information.
4/7/08 corrections required per Ken B. Solid steel trash enclosure gates are missing.
4/10/08 approved per Ken B. Trash enclosure gate has been installed.
3/9/2009 Approved per Cahty H.. 1 year warranty..Private Improvements Only |
Landscaping |
3/19/08 corrections required per Ken B. Landscape boulders in 10' clear zone on River Road and Venture. Holes in pavement at both entrances, perimeter fence and lanscape is incomplete (missing)
4/7/08 corrections required per Ken B. Solid steel trash enclosure gates are missing.
4/8/08 corrections required per Ken B. No change. Still no trash enclosure gates installed.
4/10/08 approved per Ken B. Trash enclosure gate has been installed.
3/5/2009 Approved per Pam Klotz.. Tree stakes need sto be removed |
| |
General Comments: |
|