[Fort Pierce Indrustrial Lot #158(United Rentals)]
Number: Grading-38997

Drawing of Record Submitted 3/19/2008
Electronic Drawing 3/19/2008
Final Grading Report 3/18/2008
Date Scheduled 3/20/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 3/24/2008 Corrections required per Carson Tait..Need to cut line sizes and direction of flow arrows into the concrete collars and pads. Test and tag back flow assemblies. remove the unprotected hose bib from the supply side of the outside r-p riser. 4/2/2008 Approved per Carson Tait 3/13/2009 Approved per Carson Tait.. 1 year warranty.. Wire is good
Wastewater 3/24/2008 Corrections required per Carson Tait..Need to cut line sizes and direction of flow arrows into the concrete collars and pads. Test and tag back flow assemblies. remove the unprotected hose bib from the supply side of the outside r-p riser. 4/2/2008 Approved per Carson Tait 3/13/2009 Approved per Carson Tait.. 1 year warranty.. Wire is good
Engineering 3/20/2008 Corrections required per Brandon Wrght..Dumpster needs solid metal doors per plan, storm drain boxes trim pipe and grout, landscape boulders need to be 10' behind curb. 4/3/2008 Corrections required per Brandon Wright..Storm drain boxes-trim pipe & grout, solid doors on dumpster enclosure not installed, landscape boulders in front still need to be removed from 10' clear zone. 4/8/08 corrections required per Brandon W. Not ready - no change. 4/9/08 corrections required per Brandon W. No changes have been made on list. 4/10/08 approved per Brandon W. 3/18/2009 Approved per Brandon Wright.. 1 year warranty
City Development Engineer 3/19/08 corrections required per Cathy H. Electronic DWG of record is missing junction boxes and info. Extension of drainage system to existing storm drain and all pipe sizes and information. 4/7/08 corrections required per Ken B. Solid steel trash enclosure gates are missing. 4/10/08 approved per Ken B. Trash enclosure gate has been installed. 3/9/2009 Approved per Cahty H.. 1 year warranty..Private Improvements Only
Landscaping 3/19/08 corrections required per Ken B. Landscape boulders in 10' clear zone on River Road and Venture. Holes in pavement at both entrances, perimeter fence and lanscape is incomplete (missing) 4/7/08 corrections required per Ken B. Solid steel trash enclosure gates are missing. 4/8/08 corrections required per Ken B. No change. Still no trash enclosure gates installed. 4/10/08 approved per Ken B. Trash enclosure gate has been installed. 3/5/2009 Approved per Pam Klotz.. Tree stakes need sto be removed
    